EVA started (hatch open). | 109:07:33 | 02:39:33 | 21 Jul 1969 |
CDR completely outside LM on porch. | 109:19:16 | 02:51:16 | 21 Jul 1969 |
Modular equipment stowage assembly deployed (CDR). | 109:21:18 | 02:53:18 | 21 Jul 1969 |
First clear TV picture received. | 109:22:00 | 02:54:00 | 21 Jul 1969 |
CDR at foot of ladder (starts to report, then pauses to listen). | 109:23:28 | 02:55:28 | 21 Jul 1969 |
CDR at foot of ladder and described surface as “almost like a powder.” | 109:23:38 | 02:55:38 | 21 Jul 1969 |
1st step taken lunar surface (CDR). “That’s one small step for a man…one giant leap for mankind.” | 109:24:15 | 02:56:15 | 21 Jul 1969 |
CDR started surface examination and description, assessed mobility and described effects of LM descent engine. | 109:24:48 | 02:56:48 | 21 Jul 1969 |
CDR ended surface examination. LMP started to send down camera. | 109:26:54 | 02:58:54 | 21 Jul 1969 |
Camera installed on RCU bracket, LEC stored on secondary strut of LM landing gear. | 109:30:23 | 03:02:23 | 21 Jul 1969 |
Surface photography (CDR). | 109:30:53 | 03:02:53 | 21 Jul 1969 |
Contingency sample collection started (CDR). | 109:33:58 | 03:05:58 | 21 Jul 1969 |
Contingency sample collection ended (CDR). | 109:37:08 | 03:09:08 | 21 Jul 1969 |
LMP started egress from LM. | 109:39:57 | 03:11:57 | 21 Jul 1969 |
LMP at top of ladder. Descent photographed by CDR. | 109:41:56 | 03:13:56 | 21 Jul 1969 |
LMP on lunar surface. | 109:43:16 | 03:15:16 | 21 Jul 1969 |
Surface examination and examination of landing effects on surface and on LM started (CDR, LMP). | 109:43:47 | 03:15:47 | 21 Jul 1969 |
Insulation removed from modular equipment stowage assembly (CDR). | 109:49:06 | 03:21:06 | 21 Jul 1969 |
TV camera focal distance adjusted (CDR). | 109:51:35 | 03:23:35 | 21 Jul 1969 |
Plaque unveiled (CDR). | 109:52:19 | 03:24:19 | 21 Jul 1969 |
Plaque read (CDR). | 109:52:40 | 03:24:40 | 21 Jul 1969 |
TV camera redeployed. Panoramic TV view started (CDR). | 109:59:28 | 03:31:28 | 21 Jul 1969 |
TV camera placed in final deployment position (CDR). | 110:02:53 | 03:34:53 | 21 Jul 1969 |
Solar wind composition experiment deployed (LMP). | 110:03:20 | 03:35:20 | 21 Jul 1969 |
United States flag deployed (CDR, LMP). | 110:09:43 | 03:41:43 | 21 Jul 1969 |
Evaluation of surface mobility started (LMP). | 110:13:15 | 03:45:15 | 21 Jul 1969 |
Evaluation of surface mobility end (LMP). | 110:16:02 | 03:48:02 | 21 Jul 1969 |
Presidential message from White House and response from CDR. | 110:16:30 | 03:48:30 | 21 Jul 1969 |
Presidential message and CDR response ended. | 110:18:21 | 03:50:21 | 21 Jul 1969 |
Evaluation of trajectory of lunar soil when kicked (LMP) and bulk sample collection started (CDR). | 110:20:06 | 03:52:06 | 21 Jul 1969 |
Evaluation of visibility in lunar sunlight (LMP). | 110:10:24 | 03:42:24 | 21 Jul 1969 |
Evaluation of thermal effects of sun and shadow inside the suit (LMP). | 110:25:09 | 03:57:09 | 21 Jul 1969 |
Evaluation of surface shadows and colors (LMP). | 110:28:22 | 04:00:22 | 21 Jul 1969 |
LM landing gear inspection and photography (LMP). | 110:34:13 | 04:06:13 | 21 Jul 1969 |
Bulk sample completed (CDR). | 110:35:36 | 04:07:36 | 21 Jul 1969 |
LM landing gear inspection and photography (CDR, LMP). | 110:46:36 | 04:18:36 | 21 Jul 1969 |
Scientific equipment bay doors opened. | 110:53:38 | 04:25:38 | 21 Jul 1969 |
Passive seismometer deployed. | 110:55:42 | 04:27:42 | 21 Jul 1969 |
Lunar ranging retroreflector deployed (CDR). | 111:03:57 | 04:35:57 | 21 Jul 1969 |
1st passive seismic experiment data received on Earth. | 111:08:39 | 04:40:39 | 21 Jul 1969 |
Collection of documented samples started (CDR/LMP). | 111:11 | 04:43 | 21 Jul 1969 |
Solar wind composition experiment retrieved (LMP) . | 111:20 | 04:52 | 21 Jul 1969 |
LMP inside LM. | 111:29:39 | 05:01:39 | 21 Jul 1969 |
Transfer of sample containers reported complete. | 111:35:51 | 05:07:51 | 21 Jul 1969 |
CDR inside LM, assisted and monitored by LMP. | 111:37:32 | 05:09:32 | 21 Jul 1969 |
EVA ended (hatch closed). | 111:39:13 | 05:11:13 | 21 Jul 1969 |